Reference Library

Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.

Antero Resources’ Mitigation Strategies and Best Management Practices: Wolf Springs, Mesa County (TPD1204025)

Antero Resources’ Mitigation Strategies and Best Management

Practices: Wolf Springs, Mesa County

Air Quality and Odor Control

  • All production tank venting emissions are routed to a VOC combustor
    • Purpose is to reduce odors by controlling VOC emissions from condensate flashing and working and breathing losses
  • VOC combustors operate with auto-igniters
    • Purpose is to keep VOC combustors lit
  • Flowback gas and well flow testing gas routed to temporary flare
  • Well Pad Location Telemetry/Remote Monitoring
    • Reduces well pad location truck/pumper visits
    • Low profile antenna equipment
  • Frac/Flowback Storage Tank Hatches
    • Tank hatches are closed and latched until the tanks are being prepared to receive flowback water
    • Hatches closed but unlatched when receiving flowback fluids
    • Operate with odor absorbing blanket or other similar odor control device when full
  • Diesel Powered Drilling Rig Generators
    • Drill rig engines are regulated as non-road engines under the Standards of Performance for Stationary Compression Ignition Internal Combustion Engines (40CFR 60, 85)
    • Diesel engines powering the drilling rigs are certified to at least the Tier 2/3 standards
    • Ensure that engine fuel meets regulated sulfur content requirements.
  • Separators and Wellheads – Fugitive VOC emissions from valves and flanges
    • Operate with low-bleed pneumatic devices

Fugitive Dust

  • Well pad location and access roads graveled to reduce dust impacts
  • Soiltac and/or liquid dust suppressants are used to mitigate fugitive dust emissions on access roads and well pad location
  • Buried water lines to minimize fugitive dust emissions from truck traffic
  • Limiting vehicle speeds during well pad location site access
  • Road sweeping to reduce fugitive dust and mud tracking onto roadways where practicable

Groundwater and Surface Water Resources

  • Closed loop (pitless) drilling systems; no reserve, drill cuttings or frac/flowback pits will be constructed
  • Water used for well completions will be recycled as practicable
  • Frac/Flowback tank area lined and/or tanks equipped with portable spill berm containment structures
  • Production tank containment area bermed and lined with plastic
  • Well pad location perimeter berms to contain unintended fluid releases
  • Voluntary Water Well Testing Program
    • Pre – all water wells/springs within ½ mile radius of the surface-hole location for each well on a well pad location
    • Post – within one year a follow-up test on the pretest wells/springs or when all wells drilled and completed on a well pad location
    • Where practical water quality testing as requested by landowner for water wells, springs, potable water and agriculture water
    • Comply with provisions of water well testing in surface use agreements
  • Wetland/drainage survey and mapping conducted prior to site disturbance
  • Containment for well pad location within 500 feet of surface water is 110 percent secondary containment for any volume of fluids contained at a well pad location during drilling and completion operations

Planning Infrastructure and Development Activities which Minimize Impact

  • Antero setbacks of 500 feet from dwelling units – COGCC setbacks are 150-200 feet
  • Well pad location construction not to exceed 3.5 acres
  • Bury all gas and water pipelines adjacent to roads whenever possible
  • Water used for well completions will be recycled as practicable
  • Above-ground facilities located to minimize visual effects (e.g. production tanks will be low profile tanks and painted to mitigate visual impacts)

Spill Prevention, Control and Countermeasure (SPCC Program)

  • Annual SPCC Training
  • SPCC inspections conducted quarterly
  • Well pad location perimeter berms will be constructed
    • Purpose is to provide tertiary spill containment for production tanks and separators
    • Provides secondary spill containment for all material activities on site not just oil storage.
    • Provides a barrier between well pad location activities and surrounding areas
  • Frac/Flowback tank area will be located in an area with down gradient well pad location perimeter berm
  • Frac/Flowback tank area lined to mitigate seepage losses from the unintended spillage of well completion fluids, or frac/flowback tanks will be placed in portable spill berms
  • Standard Operating Procedures (SOPs) training performed for handling and transfer of frac/flowback and produced fluids
  • High level overflow alarms installed on production tanks
  • Covered drip buckets for condensate and produced water tanks and loadout lines
    • Purpose is to minimize spillage and drips that occur during normal loading activities
    • Designed to catch residual liquids that remain in lines after the tank valves and truck valves have been closed
    • Covers minimize VOC emissions and exposure to storm water

Stormwater Management

  • Facilities operated with a Water Quality Control Division (WQCD) stormwater construction permit
  • Stormwater BMPs in accordance with the Stormwater Management Plan will be implemented in a manner that minimizes erosion, transport of sediment offsite, and site degradation
  • Inspections will be conducted every two weeks/monthly and after a precipitation or runoff event in accordance with WQCD General Permit to confirm that applicable BMPs are in place, maintained and functioning properly
  • Straw wattles and erosion blankets or other suitable erosion control devices are used to prevent sediment from leaving the site
  • Site Preparation conducted to establish stable slopes, water courses and drainage features to minimize erosion and sedimentation

Invasive Non-Native Vegetation Control

  • Weed management plan will be developed and implemented to monitor and control noxious and invasive weeds
  • Noxious weed control includes three treatments per year
  • Existing weed infestations will be mapped prior to the development of each pad, access road and pipeline when practicable
  • Reclamation/revegetation will be used as a weed management tool