Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.
Sheldon Mine Tailings Pile Cap & Drainage Enhancements
March 6, 2013
Dan Shane, US EPA R9 FOSC
Grace Ma, US EPA CIC
Brian Milton, START Contractor
Outline
Overview-
Why are we here?
Overview-
What will the EPA do about it?
Overview-
What are the impacts to local residents?
Overview-
What will the EPA do to mitigate these impacts?
Gorilla-Snot – non-toxic glue
Traffic Control and Road Crossings
Traffic Control Plan
Vicinity Map
Background
Tailings Pile
Why is there a Problem?
Remedial Actions
Site Drainage Improvements
Evapotranspiration Covers-
How do they work?
The Vegetative Cap
Erosion Control
Import Quantities
Project Summary
Eagle Road Crossing (plan view)
Eagle Road Crossing (section)
Walker Road Crossing (plan view)
Walker Road Crossing (section)
French Drain System
Tailings Pile Grading Plan
A Few Definitions
Copyright Soilworks, LLC 2003-. All Rights Reserved. Soilworks®, Soiltac®, Gorilla-Snot®, and Durasoil®are registered trademarks of Soilworks, LCC.
Copyright Soilworks, LLC 2003-. All Rights Reserved. Soilworks®, Soiltac®, Gorilla-Snot®, and Durasoil® are registered trademarks of Soilworks, LCC.