Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.
During the PG&E Hunters Point Power Plant Cleanup, Soiltac was applied as a critical dust control and soil stabilization measure to mitigate airborne asbestos exposure. The site, undergoing concrete demolition, excavation, and backfilling, required enhanced dust suppression strategies when air monitoring detected asbestos levels above the trigger threshold. Soiltac was reapplied multiple times, reinforcing its effectiveness in binding soil particles and reducing hazardous airborne contaminants.
This project highlights the importance of Soiltac in environmental remediation, ensuring compliance with air quality and worker safety regulations. Its biodegradable copolymer formula provides long-lasting dust control, minimizing health risks and regulatory concerns at contaminated sites. Contact Soilworks for specialized dust suppression solutions in environmental cleanup and hazardous material containment.
Hunters Point Power Plant Cleanup ‐ Air Monitoring Results
Following is an overview of the air monitoring results for airborne naturally occurring asbestos that PG&E collected at the former Hunters Point Power Plant site from July 5 to July 15, 2011, on days that work was being conducted. For this period, there were three days with readings above the Trigger Level, a conservative threshold at which additional dust controls will be implemented. A summary of the readings is below.
July 5 to July 8, 2011

July 11 to July 15, 2011
