Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.

PG&E Hunters Point Poser Plant Cleanup Air Monitoring Results (TPD1507060)

Hunters Point Power Plant Cleanup ‐ Air Monitoring Results

Following is an overview of the air monitoring results for airborne naturally occurring asbestos that PG&E collected at the former Hunters Point Power Plant site from July 5 to July 15, 2011, on days that work was being conducted. For this period, there were three days with readings above the Trigger Level, a conservative threshold at which additional dust controls will be implemented. A summary of the readings is below.

July 5 to July 8, 2011

Chart Graph Placeholder

 

July 11 to July 15, 2011

 

Chart Graph Placeholder

Complete the form below to download this document now.

https://bit.ly/3c8wIdr