Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.
2018-2019 ATV Bridge/Trail Rehabilitation Requests
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NER |
Oconto
NO. 11 |
The county proposes to apply dust control on the Nicolet State Trail on sections along Highway 32. The dust is causing visibility issues on the highway and the Town of Townsend has requested a solution. The county has had success with this project in the past. Requesting $65,000 from RTP |
*Structure |
|
$130,000 |
|
4. Time frame: – How does it work? – How long will a treatment work? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$65,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$111,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 65,000.00 |
Labor |
$18,300 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$65,000 |
|||
WCR |
Jackson
NO. 12 |
Sugar Loaf Rehab – Jackson County proposes to rehabilitate approximately 1/2 mile of ATV trail on Trail #9 (Pray Access Trail). Due to heavy use and unstable soil type this section of trail is very difficult to maintain. The county proposes to re-crown and surface this section of trail using 6 inches of 1 1/4 base course. |
*Structure |
|
$22,020 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$22,020 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$11,025 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$1,080 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$9,915 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$22,020 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Burnett
NO. 1 |
Troute Rehab – Burnett County is requesting rehab funds to repair portions of TROUTE 41 west of Dogtown Creek. The project will include adding gravel and dozing. TROUTE rehab is eligible at 50% of the $3600 for $1800. Dogtown TROUTE rehab. |
*Structure |
$1,800 |
$1,800 |
|
|
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$1,800 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$1,800 |
|||
NOR |
Burnett
NO. 2 |
Burnett County is requesting rehab funds to repair the bridge on Trail 925 by replacing the decking which will increase the weight limit to 14000 lbs, Trail 925 Bridge rehab |
*Structure |
|
$16,000 |
|
None. |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$8,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$7,000 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 8,000.00 |
Labor |
$9,000 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
12×42 |
New Bridge Size |
12×42 |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Glendenning Cr |
Labor Source: |
steel |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
20 |
Design Weight Load: |
14,00 |
UTV Maint |
$0 |
$8,000 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Burnett
NO. 3 |
Burnett County is requesting rehab funds for Trails 6 and 7 in the Town of Webb Lake. The project involves grading and add 4-6 inches of gravel. RTP funds are also applied for. |
*Structure |
|
$79,900 |
|
|
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$39,950 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$79,900 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
Yes |
Amount: |
$ 39,950.00 |
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$39,950 |
|||
NOR |
Burnett
NO. 4 |
Burnett County is requesting trail rehab funding to repair hotspots on Trail 41. The repairs are along a 4 mile section of the trail and include adding gravel to problem areas. Trail 41 Rehab. |
*Structure |
|
$21,600 |
|
1. Why weren’t snowmobile funds applied for? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$21,600 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$21,600 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$21,600 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Burnett
NO. 5 |
Burnett County is requesting rehab funds for Trail 8. The project includes repairs to problem areas on the 5.5 stretch of the trail. Trail 8 Rehab. |
*Structure |
$36,000 |
$36,000 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$36,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$36,000 |
|||
NOR |
Douglas
NO. 6 |
Douglas County proposes to complete 3 segments of trail rehab on the Wild Rivers Trail. The project is to add 4 inches of gravel to the 3 problem areas.
RTP fund applied for. |
*Structure |
|
$53,575 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$26,788 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$53,575 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
Yes |
Amount: |
$ 26,787.50 |
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$26,788 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Rusk
NO. 7 |
Rusk County proposes to replace the Moose Ear Bridge. Moose Ear Bridge Replacement.
Snowmobile funds have been applied for. |
*Structure |
$35,000 |
$49,500 |
|
Bridge questions:
|
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
|
$24,750 |
||||||||
site prep |
$3,500 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$2,500 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 24,750.00 |
Labor |
$8,500 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
12×24 |
New Bridge Size |
12×36 |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Moose Ear Cr |
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
? |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$24,750 |
|||
NOR |
Sawyer
NO. 8 |
Sawyer County proposes to rehab Trail 8 for 1.65 miles from Highway ‘OO’ to Boedecker Rd. |
*Structure |
$16,500 |
$24,750 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$24,750 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$8,250 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$24,750 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Sawyer
NO. 9 |
Sawyer County proposes to rehab the Tuscobia Trail for 13.25 miles from the Price County line to Sundling Rd. Tuscobia Trail Rehab. |
*Structure |
|
$170,010 |
|
1. Why was only ATV funding requested? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$170,010 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$170,010 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$170,010 |
|||
NER |
Oconto
NO. 10 |
The county proposes to fence and add additional signage to this 2 mile segment of trail where ATVers are leaving the trial causing erosion, damage to trees, and destruction of natural resources. |
*Structure |
$7,500 |
$12,000 |
|
None |
|||
Engineer |
$3,510 |
After Cost Share: |
||||||||
Gravel |
$990 |
$12,000 |
||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
public |
Funded seasons: |
summer |
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$12,000 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NER |
Oconto
NO. 11 |
The county proposes to apply dust control on the Nicolet State Trail on sections along Highway 32. The dust is causing visibility issues on the highway and the Town of Townsend has requested a solution. The county has had success with this project in the past. Requesting $65,000 from RTP |
*Structure |
|
$130,000 |
|
4. Time frame: – How does it work? – How long will a treatment work? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$65,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$111,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 65,000.00 |
Labor |
$18,300 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$65,000 |
|||
WCR |
Jackson
NO. 12 |
Sugar Loaf Rehab – Jackson County proposes to rehabilitate approximately 1/2 mile of ATV trail on Trail #9 (Pray Access Trail). Due to heavy use and unstable soil type this section of trail is very difficult to maintain. The county proposes to re-crown and surface this section of trail using 6 inches of 1 1/4 base course. |
*Structure |
|
$22,020 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$22,020 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$11,025 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$1,080 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$9,915 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$22,020 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Jackson
NO. 13 |
Indian Grave/Levis Creek Rehabilitation – This section of trail is part of Trail #9 (aka Ott Memorial Trail). Jackson County proposes to rehabilitate by re-crowning the trail in its existing footprint, surface the sections of trail to minimize or eliminate sediment loading, install silt fencing along the bridge during construction and seed the side of slopes of the trail to hold material in place. Due to the steep slopes, the thickness of gravel used will increase to 10 inches in depth. The total length of trail to be surfaced in 3,300 feet. |
*Structure |
|
$47,490 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$47,490 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$27,545 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$2,295 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$17,650 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$47,490 |
|||
WCR |
Jackson
NO. 14 |
Cranberry/Saddle Mound Rehabilitation – This section of trail is 2.8 miles of Trail 54. Jackson County proposes to rehabilitate by surfacing approximately 2,700 feet to protect the crown. The remainder of the trail will be crowned and/or ditched to alleviate problems with stormwater runoff. Thse sections will not be surfaced as part of this project. |
*Structure |
|
$31,775 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$31,775 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$13,650 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$3,240 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$14,885 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$31,775 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Jackson
NO. 15 |
Brockway Rehabilitation – This section of trail is part of Trail #9 (aka Ott Memorial Trail). Jackson County proposes to rehabilitate approximately 1.2 miles of trail using a combination of re-crowning the trail to facilitate drainage and surfacing two sections (totaling .6 miles) of this 1.2 miles that cause continual maintenance problems. |
*Structure |
|
$31,681 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$31,681 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$16,681 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$2,160 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$12,840 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$31,681 |
|||
WCR |
Marathon
NO. 16 |
Marathon County proposes building a clear span bridge over the East Branch of the Big Eau Pleine River. The total length of the bridge with an approach on each end would be 85′. This is currently an unreliable ice crossing. This would be a NEW bridge. Snowmobile is being asked to fund this project at 50 percent. |
*Structure |
$63,000 |
$84,500 |
|
Bridge questions:
|
|||
Engineer |
$4,000 |
After Cost Share: |
||||||||
Gravel |
|
$42,250 |
||||||||
Permits/Erosion |
|
|||||||||
Materials |
$1,000 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$1,500 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 42,250.00 |
Labor |
$13,000 |
|
||||
Public or Private: |
private |
Funded seasons: |
winter |
Equip Rental |
$2,000 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
0 |
New Bridge Size |
12′ x 85′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Big Eau Pleine |
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
0 |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$42,250 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Marathon
NO. 17 |
Marathon County proposes to replace a structurally failing bridge on Baldwin Creek. Bridge #9 on BI. The total length of the bridge with an approach on each end would be 66′. Snowmobile is being asked to fund this project at 50 percent. |
*Structure |
$49,000 |
$70,000 |
|
Bridge questions:
|
|||
Engineer |
$4,000 |
After Cost Share: |
||||||||
Gravel |
$2,000 |
$35,000 |
||||||||
Permits/Erosion |
|
|||||||||
Materials |
$1,000 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$1,000 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 35,000.00 |
Labor |
$11,000 |
|
||||
Public or Private: |
private |
Funded seasons: |
winter |
Equip Rental |
$2,000 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
12′ 24′ |
New Bridge Size |
12′ x 66′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Baldwin Creek |
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
33 |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$35,000 |
|||
NOR-R |
Lincoln
No. 18 |
Lincoln County proposes replacing an existing club built bridge over Green Meadow Creek with a steel clear span bridge. The existing bridge is set too low and has been washed off the sill timbers more than once. The new bridge will be longer, allowing for it to be placed higher over the ordinary high water mark. Cost difference between 14k and 25k bridge is quoted at $2,500, County is requesting a 25k bridge. Bridge is used by snowmobiles and winter ATVs, county has applied for RTP (50%) and snowmobile (25%) as well. |
*Structure |
$45,000 |
$85,277 |
|
Bridge questions:
|
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$303 |
$21,319 |
||||||||
Permits/Erosio |
$3,500 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
$10,000 |
|
||||||||
Piling/Piers |
$10,000 |
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 63,958 |
Labor |
$15,344 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Winter |
Equip Rental |
$1,130 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
10′ x 30′ |
New Bridge Size |
12′ x 40′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Green Meadow |
Labor Source: |
Contract |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
unknown |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$21,319 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Lincoln
No. 19 |
Lincoln County proposes to replace a washed-out culvert with a pair of 42″x24′ culverts (technically a bridge rehab project), and install a pair of 36″x24′ culverts at another location a half-mile away on Four Mile Trail, Corridor 19. Trail is used by snowmobiles and winter ATVs, 50/50 split is requested. |
*Structure |
|
$10,003 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$303 |
$5,002 |
||||||||
Permits/Erosio |
$200 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$3,100 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 5,002 |
Labor |
$1,500 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Winter |
Equip |
$4,900 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
54″x36″18′ |
New Bridge Size: |
2 42″x24′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
unnamed |
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
unknown |
Design Weight Load: |
N/A |
UTV Maint |
$0 |
$5,002 |
|||
NOR-R |
Florence
No. 20 |
Florence County proposes to replace an undersized culvert on the F2 trail near County Hwy N. This year-round trail is open for ATV and Snowmobile use. The county is requesting a 50/25/25 split between RTP/ATV/Snow programs. |
*Structure |
|
$9,642 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$2,411 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$1,600 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$3,800 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$400 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 7,231 |
Labor |
$1,813 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip Rental |
$2,029 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
24″ Culvert |
New Bridge Size: |
64″x43″x50′ Culvert |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
run-off |
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
14+ |
Design Weight Load: |
N/A |
UTV Maint |
$0 |
$2,411 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Florence
No. 21 |
Florence County proposes to reshape and resurface 1.02 miles of trail and replace an undersized culvert on Trail 6 between the Oxbow Take Out and Johnson Creek Rd. The sandy soil in this area is prone to excessive erosions. The trail is also a snowmobile trail but the winter snowmobile use has not resulted in problems. The county is requesting 50% funding from the RTP program. |
*Structure |
|
$41,694 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$10,400 |
$20,847 |
||||||||
Erosion |
$1,000 |
|
||||||||
Materials |
$800 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$2,520 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$200 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 20,847 |
Labor |
$10,665 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip |
$16,109 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
49″x33″x40′ Culvert |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$20,847 |
|||
NOR-R |
Florence
No. 22 |
Florence County proposes to rehab 0.2 miles of Trail 6 south of the Pine River Bridge off of County Hwy N, to widen the trail and correct an erosion problem. Erosion problems have resulted in significant sediment deposit into the nearby Pine River. This trail is a year-round ATV trail as well as a snowmobile trail, and a fatality occurred in 2016 when a snowmobiler collided with a groomer in this narrow section. The county is requesting a 50/25/25 split between RTP/ATV/Snow programs. |
*Structure |
|
$18,992 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
|
$4,748 |
||||||||
Erosion |
$1,000 |
|
||||||||
Materials |
$1,250 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$2,000 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 14,244 |
Labor |
$6,684 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip Rental |
$8,058 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
N/A |
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$4,748 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Taylor
No. 23 |
Taylor County proposes to replace the decking and railings the Silver Creek bridge on the Pine Line trail. This trail is open for snowmobile and winter ATV as well as non-motorized use. The county is requesting a 50/25/25 split between RTP/ATV/Snow programs. |
*Structure |
|
$45,242 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$11,310 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$24,082 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 33,931 |
Labor |
$13,800 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Winter |
Equip Rental |
$4,600 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Disposal |
$2,760 |
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
10.8’x184′ |
New Bridge Size |
no change |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Silver Creek |
Labor Source: |
Contract |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
28 |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$11,310 |
|||
NOR-R |
Taylor
No. 24 |
Taylor County proposes to rehab 2.05 miles of trail 326 on USFS property, which includes replacing a failed culvert with a clear span bridge (McKenzie Creek South). The culvert has been damned by beavers and washed out regularly in the past. The USFS is contributing labor, equipment and materials for the project including equipment and labor for installation of the bridge. Some rehab work has already been done by the USFS on this segment to widen and level the trail. The county is requesting funds to continue the trail rehab work including 2″ stone and 3″ dense base surfacing. This trail rehab will make it possible to deliver the bridge and improve sustainability of the trail. County is also requesting a 50% cost share from RTP. |
*Structure |
$33,100 |
$76,902 |
|
` |
|||
Engineer |
$3,738 |
After Cost Share: |
||||||||
Gravel |
$18,800 |
$38,451 |
||||||||
Permits/Erosio |
$250 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
$10,000 |
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$170 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$1,800 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 38,451 |
Labor |
$400 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip |
$8,145 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
$500 |
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
60″x25′ Culvert |
New Bridge Size |
32′ x 12′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
McKenzie Crk |
Labor Source: |
Contract + USFS |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$38,451 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Taylor
No. 25 |
Taylor County proposes to rehab 2.2 miles of trail on the Chequamegon National Forest (McKenzie Creek North). Of this 2.2 miles, 1.3 miles has become rutted, potholed and degraded due to poor design and heavy use. The county intends to level/shape with dozer/excavator, spot-treat with breaker run, and add a 4″ layer of gravel to the entire length. The remaining 0.9 miles will be leveld/shaped and spot- treated with gravel only where needed. Three 12″x20′ culverts will be installed for drainage. The county has also requested RTP funding. |
*Structure |
|
$30,361 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$21,140 |
$15,180 |
||||||||
Permits/Erosio |
$330 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$405 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 15,180 |
Labor |
|
|
||||
Public or Private: |
Public |
Funded seasons: |
|
Equip |
$8,486 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
20″x12′ culverts |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Contract |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$15,180 |
|||
NOR-R |
Oneida
No. 26 |
Oneida County proposes to rehab 5 miles of trail in the Enterprise ATV Trail System (Phase 2). The rehab project begun with grant ATV-3362 and completed in 2017, which resurfaced southern 7 miles of the system. This project will complete the efforts be resurfacing the northern 5 miles of the system with 4 to 6″ depths of gravel. Resurfacing is necessary to address pot-holes, ruts and erosion, and protect the county’s forest certification by meeting the BMPs of the Sustainable Forestry Initiative and Forest Stewardship Council. County has also requested 50% from RTP. |
*Structure |
$92,400 |
$102,300 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel+Equip |
$51,150 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$9,900 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
Yes |
Amount: |
$ 51,150.00 |
Labor |
|
|||||
Public or Private: |
Public |
Funded seasons: |
S/S/F |
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$51,150 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Iron
No. 27 |
Iron County proposes to rehab 8.1 miles of Trail 6 near near Saxon. Project will replace 30 plastic culverts that have heaved out of the ground with steel culverts, and put down a gravel base to protect the trail surface and address erosion concerns. The county is requesting 50% from RTP and is requesting a 75/25 split on the remaining costs between ATV/Snow. |
*Structure |
|
$148,736 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$55,776 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$16,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$4,482 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 92,960 |
Labor |
$50,913 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip Rental |
$76,641 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$55,776 |
$932,650 $0
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Juneau
No. 30 |
Juneau County is requesting maintenance on 3.2 new miles for ATV/UTV trail on the Hillsboro State Trail. The trail is maintained by agreement of Juneau County, Vernon County and the City of Hillsboro. This request is in anticipation of the trail becoming approved for multi-use with the 2018 calendar year. The trail links the Village of Union Center in Juneau County to the City of Hillsboro in Vernon County. This would be the first State Trail Corridor open to ATV/UTV’s in the County. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
summer, winter |
Equip Rental |
|
|||||
New Sum Maint |
3.2 |
New Winter Maint |
3.2 |
Gates |
|
|||||
New UTV Maint |
3.2 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$1,920 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$320 |
$2,560 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$320 |
$2,560 |
|||
WCR |
Juneau
No. 31 |
Juneau County is requesting maintenance on 1 new mile of ATV/UTV trail. New trail will expand riding and bridge routes in an area that are divided by State Hwy. 58. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
summer, winter |
Equip Rental |
|
|||||
New Sum Maint |
1 |
New Winter Maint |
1 |
Gates |
|
|||||
New UTV Maint |
1 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$600 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$100 |
$800 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$100 |
$800 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR- R |
Taylor
No. 32 |
Taylor County proposes to develop 2.02 miles of trail connecting the Camp 8 ATV Trail System to the Village of Spirit. This trail was previously open as an unfunded trail but heavy use necessesitated it’s closure. Scope of work includes leveling/shaping, spot-treatment with breaker-run, and a 4″ layer of gravel applied to the length of trail, as well as several culverts. This trail is already a funded winter ATV trail (and snowmobile), this project will turn it into a year-round funded trail. County has requested 50% from RTP. |
*Structure |
|
$43,073 |
|
– the village -the Camp 8 trail system |
|||
Engineer |
|
After Cost |
||||||||
Gravel |
$26,690 |
$21,537 |
||||||||
Erosion |
$120 |
|
||||||||
Materials |
$1,100 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$1,440 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$320 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 21,536 |
Labor |
$400 |
|
||||
Public or Private: |
|
Funded seasons: |
Year-Round |
Equip |
$12,253 |
|
||||
New Sum Maint |
2.02 |
New Winter Maint |
0 |
Gates |
$750 |
|
||||
New UTV Maint |
2.02 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$1,212 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Contract |
Winter Maint |
$0 |
$1,414 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$202 |
$22,951 |
$26,310.60 $0.00
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments |
|||
NOR |
Burnett
No. 40 |
Burnett County proposes to add 2.2 miles on new TROUTE in the Town of Blaine. This TROUTE runs from the intersection of Trail 925 and 151 to Big Mcgraw Rd route. |
|
|
$660 |
|
1. Explain how this qualifies as a troute. |
|||
$660 |
||||||||||
Current Non-Gas Tax Miles |
|
New Non-Gas Tax Miles |
2.2 |
|
||||||
Current Gas Tax Miles |
|
New Gas Tax Miles |
|
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ 660.00 |
|
|||||||
|
GT Rds |
$ – |
$660 |
|||||||
WCR |
Eau Claire
No. 41 |
Eau Claire County wishes proposes to maintain 3.28 miles of Troute on gas-tax funded forest roads. Channey Road 2.44 miles and Forest Road #3 .84 miles. The additional new miles of 3.28 of as tax funded forest road Troute @ $287.96 = $944.44 |
|
|
$944 |
|
|
|||
$944 |
||||||||||
Current Non-Gas Tax Miles |
|
New Non-Gas Tax Miles |
|
|
||||||
Current Gas Tax Miles |
|
New Gas Tax Miles |
3.28 |
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ – |
|
|||||||
|
GT Rds |
$ 944.50 |
$944 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments |
|||
NOR |
Oneida
No. 42 |
Oneida County proposes to maintain two segments of county forest road known as Bowman Rd (0.2 miles) and Zimmer Rd (2.2) miles. Bowman Rd connects trail-to- trail, while Zimmer Road connects trail to a parking lot as well as County Hwy (Route). |
|
|
$691 |
|
None |
|||
$691 |
||||||||||
Current Non-Gas Tax Miles |
|
New Non-Gas Tax Miles |
|
|
||||||
Current Gas Tax Miles |
1.9 |
New Gas Tax Miles |
2.4 |
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ – |
|
|||||||
|
GT Rds |
$ 691.10 |
$691 |
|||||||
NOR-R |
Langlade
(See No. 57) |
Langlade County proposes to maintain 6.28 miles of non-gas-tax Forest Service roads in conjuction with their development request for new ATV trails near the Town of Wolf River. See the new summer development application (Wolf River) for details. |
|
|
$1,884 |
|
None |
|||
$1,884 |
||||||||||
Current Non-Gas Tax Miles |
3.5 |
New Non-Gas Tax Miles |
6.28 |
|
||||||
Current Gas Tax Miles |
|
New Gas Tax Miles |
|
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ 1,884.00 |
|
|||||||
|
GT Rds |
$ – |
$1,884 |
|||||||
|
|
|
|
|
|
|
|
$4,180 |
$0.00 |
|
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR |
USFS-Sawyer
No. 50 |
Deadhorse Amendment. The USFS request additional funding to complete the boardwalks from Grant ATV-2086. The project includes the construction of 2 bridges constructed to USFS specifications. This amendment is in addition to the $315,480 from the existing grant. Deadhorse Amendment. |
*Structure |
$279,044 |
$279,044 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$279,044 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$279,044 |
|||
NER |
Oconto
No. 51 |
The USFS is proposing to construct a new section of trail to include a new bridge over Knowles Creek. The project will add .43 miles of ATV/UTV trail and 1.70 miles of Troute. This project will provide a direct connection between the Nicolet State Trail and northern Marinette County trails. Bridge estimate = $197,000 and trail dev estimate = $91,475.
Applying for RTP grant. |
*Structure |
$116,000 |
$288,475 |
|
None |
|||
Engineer |
$7,000 |
After Cost Share: |
||||||||
Gravel/pit run |
$47,150 |
$144,238 |
||||||||
trail const |
$22,350 |
|
||||||||
gates & signs |
$3,225 |
|
||||||||
Abutments |
$20,000 |
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
site prep |
$15,000 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$2,000 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 144,237.00 |
Labor |
$7,000 |
|
||||
Public or Private: |
|
Funded seasons: |
summer |
Equip Rental |
$18,750 |
|
||||
New Sum Maint |
0.43 |
New Winter Maint |
|
site engineerin |
$30,000 |
|
||||
New UTV Maint |
0.43 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
n/a |
New Bridge Size |
150′ x 12′ |
Sumer Maint |
$258 |
|
|||
Exception? |
Water Body: |
Knowles Creek |
Labor Source: |
contractor |
Winter Maint |
$0 |
$301 |
|||
|
Years in System: |
n/a |
Design Weight Load: |
20,000 |
UTV Maint |
$43 |
$144,539 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Woodboro, Town of
No. 52 |
The Town of Woodboro proposes to develop 1.7 miles of ATV/UTV trail in the DNR Woodboro Lakes Wildife Area. This trail will connect town route Oscar Jenny Rd to a proposes new ATV trail on Oneida County land (application below). A 50′ boardwalk is needed to cross a wetland on the wildlife area. The town is working with Oneida County in the hopes that the county will take over long term maintenance and management of the trail. The town has applied for grant assistance from the RTP program as well, and the Nokomis ATV Club is donating $30,000. |
*Structure |
$107,600 |
$385,900 |
|
|
|||
Engineer |
$60,000 |
After Cost Share: |
||||||||
Gravel |
$83,600 |
$177,950 |
||||||||
Erosion |
$14,000 |
|
||||||||
Materials |
$12,100 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$4,500 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$15,000 |
|
|||||||
Yes or No: |
YES |
Amount: |
$ 207,950 |
Labor |
|
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Clearing |
$60,500 |
|
||||
New Sum Maint |
1.7 |
New Winter Maint |
|
Misc |
$28,600 |
|
||||
New UTV Maint |
1.7 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$1,020 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Contract |
Winter Maint |
$0 |
$1,190 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$170 |
$179,140 |
|||
NOR-R |
Oneida
No. 53 |
Oneida County proposes to develop 1.2 miles of ATV/UTV trail connecting the proposed Woodboro Lakes Wildlife Area trail to the north (above) with Cruisers Road (route) to the south. The trail footprint will utilize existing logging roads but culverts will be installed to control drainage, spot-treatment with pit-run to raise the trail as needed, and a 4-6″ cap of loose gravel will be added, leveled, packed and crowned. No wetland crossings are needed. The county has applied for grant assistance from the RTP program as well. |
*Structure |
|
$50,566 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$12,600 |
$25,283 |
||||||||
Erosion |
$420 |
|
||||||||
Materials |
$2,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$375 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
YES |
Amount: |
$ 25,283 |
Labor |
$1,585 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Equip Rental |
$30,087 |
|
||||
New Sum Maint |
1.2 |
New Winter Maint |
|
Gates |
$2,800 |
|
||||
New UTV Maint |
1.2 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$720 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force |
Winter Maint |
$0 |
$840 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$120 |
$26,123 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Oneida
No. 54 |
Oneida County proposes to maintain 1.1 miles of ATV/UTV trail in the Little Rice area known as the Willow Dam Trail. This trail utilizes an old logging road and was opened for use on DNR land last year, with the local club provinding labor and materials. The county is seeking maintenance only to continue to provide this route-alternative for trail riders. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
Public |
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
1.1 |
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
1.1 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$660 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$770 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$110 |
$770 |
|||
NOR-R |
Vilas
No. 55 |
Vilas County proposes to maintain 1.6 miles of new ATV/UTV trail in Conover, along CTH K. This new trail was in place and open last year, and replaces a stretch of route on county highway. The county is seeking maintenance only to continue to provide this route-alternative for trail riders. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
Public |
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
1.6 |
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
1.6 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$960 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$1,120 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$160 |
$1,120 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Vilas
No. 56 |
Vilas County proposes to maintain 6.1 miles of new ATV/UTV trail in Land O’ Lakes connecting to the current Conover area trails. This new trail was in place and open last year. The county is seeking maintenance only. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
6.1 |
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
6.1 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$3,660 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$4,270 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$610 |
$4,270 |
|||
NOR-R |
Langlade
No. 57 |
Langlade County proposes to develop 3.3 miles of new trail (and maintain 6.28 miles of new troute) near the Town of Wolf River. This project includes development of a 120′ multi-use bridge over the Wolf River. In conjuction with local routes, this will create a connection between the Nicolet State Trail and the Wolf River State Trail. The county has already obtained a $19,900 grant from the Forest Service for work on the forest service troutes. The county is requesting grant funds from the Snowmobile and RTP programs for construction of the bridge. Cost share request below currently does not include RTP. |
*Structure |
$190,000 |
$419,921 |
|
None |
|||
Engineer |
$61,750 |
After Cost Share: |
||||||||
Gravel |
$36,419 |
$265,746 |
||||||||
Permits/Erosio |
$5,240 |
|
||||||||
Materials |
$35,435 |
|
||||||||
Abutments |
$15,000 |
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
$20,000 |
|
||||||||
Culverts |
$2,517 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$5,000 |
|
|||||||
Yes or No: |
YES |
Amount: |
$ 154,175.00 |
Labor |
$10,000 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Clearing Trees |
$17,020 |
|
||||
New Sum Maint |
3.3 |
New Winter Maint |
|
Other |
$21,540 |
|
||||
New UTV Maint |
3.3 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
120′ x 12′ |
Sumer Maint |
$1,980 |
|
|||
Exception? |
Water Body: |
Wolf River |
Labor Source: |
|
Winter Maint |
$0 |
$2,310 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$330 |
$268,056 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Oneida
No. 58 |
Oneida County would like to eliminate a half-mile of road route (Bowman Rd, currently a funded “troute”) and replace it with 0.56 miles of new ATV/UTV trail. This segment connects to funded ATV trail on both ends, and would be part of the 12+ mile Enterprise ATV system. Scope of work includes clearing, dozing, gravel/fill, culverts and gates. The county has also applied to the RTP program for 50% cost share. |
*Structure |
|
$16,361 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$4,466 |
$8,181 |
||||||||
Erosion |
$1,351 |
|
||||||||
Materials |
$5,416 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$810 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
$ 8,180 |
Labor |
$860 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Equip |
$658 |
|
||||
New Sum Maint |
0.56 |
New Winter Maint |
|
Gates |
$2,800 |
|
||||
New UTV Maint |
0.56 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$336 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$392 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$56 |
$8,573 |
$911,634.93 $0.00
2018-2019 ALL-TERRAIN VEHICLE NEW INTENSIVE USE AREA REQUESTS
$239,000.00 $0.00
Proj #
70
71
2018-19 ALL-TERRAIN VEHICLE NEW MAP REQUESTS
REGION |
COUNTY |
DESCRIPTION |
TOTAL |
APPROVED |
NOR |
Douglas |
10,000 ATV Maps |
$4,200 |
|
NOR-R |
Oneida |
Littlerice & Enterprise ATV Maps (3,500) |
$1,575 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$5,775 $0
Page 25 of 33
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Bayfield
No. 80 |
Bayfield County is requesting winter maintenance funding on Trail 18 in Delta Township. This is a short section of existing trail that is not funded. Snowmobile funding is also requested. Trail 18 new miles. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
3.44 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$344 |
$344 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$344 |
||
NOR |
Bayfield
No. 81 |
Bayfield County is requesting maintenance funding for Trail 17 connector. The trail will connect Gordon to the Hayward area involving Sawyer, Douglas, and Bayfield County. Trail 17 Connector. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
5.69 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$569 |
$569 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$569 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Burnett
No. 82 |
Burnett County is requesting maintenance funding on Trail 8A for 1.3 miles. Trail 8A new miles. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
1.3 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$130 |
$130 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$130 |
||
NOR |
Burnett
No. 83 |
Burnett County is requesting maintenance funding on Trail 8 for 2 miles. Trail 8 new miles. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
2 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$200 |
$200 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$200 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Douglas
No. 84 |
Douglas County is requesting maintenance funding on Trail 17 for 6.4 miles. The trail will connect Gordon to the Hayward area involving Sawyer, Douglas, and Bayfield County. Trail 17 Connector. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
6.4 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$640 |
$640 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$640 |
||
NOR-R |
Lincoln
No. 85 |
Lincoln County proposes to maintain 4.2 miles of winter ATV trail in the Harrison Hills area. These trails (two segments) has been open for winter ATV use for many years but was not receiving winter ATV funding. County is looking for mainteance only, no development funds needed. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
Public |
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
4.2 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$420 |
$420 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$420 |
23.03 $2,303 $0
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Bayfield No. 90 |
Bayfield County is requesting funding to construct a shelter at the trailhead on Trail 3 and 43. Trail 3 Shelter. |
*Structure |
|
$21,992 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$21,992 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$17,112 |
|
|||||||
Abutments |
|
|
|||||||
Piling/Piers |
|
|
|||||||
Approaches |
|
|
|||||||
Culverts |
|
|
|||||||
Other funds received, requested, or committed? |
Riprap |
|
|
||||||
Yes or No: |
No |
Amount: |
|
Labor |
$4,380 |
|
|||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
|||
New Sum Maint |
|
New Winter Maint |
|
Other-permit |
$500 |
|
|||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$21,992 |
||
NOR |
Burnett No. 91 |
Burnett County requests additional funding for the Danbury Campground. The request is for 60% of the total cost of $1,100,100.
The county is also applying for RTP, Motorized Stewardship which they plan to match with 20% of county funds. |
*Structure |
|
$584,260 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$584,260 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$584,260 |
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$584,260 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Shell Lake No. 92 |
The City of Shell Lake is requesting an amendment to the the existing grants to finish the campground project. The increase is due to higher than expected bids for the project. Shell Lake ATV Campground
Also applying for Motorized Stew which would reduce this request. |
*Structure |
|
$285,006 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$285,006 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$285,006 |
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$285,006 |
||
NOR |
Rusk No. 93 |
Rusk County is requesting funding to construct an replace an old outhouse at the Blue Goose warming shelter. This is used by both ATV and Snowmobile. Total cost is $15,490 with $3750 being donated by the loacl clubs. Blue Goose Toilet replacement.
The remaining half is being requested from snowmobile. |
*Structure |
$15,490 |
$15,490 |
None |
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$5,870 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
TRUE |
Amount: |
$ 9,620.00 |
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$5,870 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
WCR |
Jackson No. 94 |
Emergency Response Improvements – Jackson County Forestry & Parks in conjunction with Black River Falls EMS, Jackson Co Sheriff’s Dept., BR Memorial Hospital, Gundersen Lutheran Air Medical Services and the BR Forest propose to further enhance the emergency services that can be provided on the trail system. The project will include increasing signage to provide markers on both sides of the trail and construction of four helipad locations. (See narrative for more details.) |
Const. & Sign |
$9,250 |
$9,250 |
None |
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$9,250 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$9,250 |
Total $906,378 $0
Page 31 of 33
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Burnett No. 170 |
Burnett County is proposing to acquire a 10 acre parcel of land to complete a trail between two of the County’s existing land. Trail 45 Acquisition.
Half has been requested from Snowmobile. |
*Structure |
|
$25,000 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$12,500 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$25,000 |
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 12,500.00 |
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Acquisition |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$12,500 |
||
WCR |
Adams/ Dyracuse
No. 171 |
Town of Rome ATV Intensive Use Area proposes to purchase 155.27 acres from Meteor Timber Holdings LLC. The property is contiguous to Dyracuse property purchased with grant funding in 2017. The cost includes the property, along with an appraisal, attorney’s fees, and other associated costs. |
Campsite |
|
$423,000 |
|
|||
Electrical |
After Cost Share: |
||||||||
Gravel |
$423,000 |
||||||||
Site Prep |
|
||||||||
Other labor |
|
||||||||
Signage/Maps |
|
|
|||||||
Challenge track |
|
||||||||
Topsoil |
$423,000 |
|
|||||||
Labor |
|
||||||||
Other funds received, requested, or committed? |
Picnic Tables |
|
|||||||
Yes or No: |
No |
Amount: |
|
Equip Rental |
|
||||
Public or Private: |
|
Funded seasons: |
|
Fire Rings |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Acquisition |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$423,000 |
WCR |
Adams/ Dyracuse
No. 172 |
Town of Rome ATV Intensive Use Area proposes to purchase 120.0 acres from Robert Kublank. Ths property is contiguous to Meteor Timber Holdings, LLC property that the Town is considering. The cost includes the property, along with an appraisal, attorney’s fees, and other associated costs. |
Campsite |
|
$328,000 |
|
|||
Electrical |
After Cost Share: |
||||||||
Gravel |
$328,000 |
||||||||
Site Prep |
|
||||||||
Other labor |
|
||||||||
Signage/Maps |
|
|
|||||||
Challenge track |
|
||||||||
Topsoil |
$328,000 |
|
|||||||
Labor |
|
||||||||
Other funds received, requested, or committed? |
Picnic Tables |
|
|||||||
Yes or No: |
No |
Amount: |
|
Equip Rental |
|
||||
Public or Private: |
|
Funded seasons: |
|
Fire Rings |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Acquisition |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$328,000 |
||
|
|
|
|
|
|
|
|
$763,500.00 |
$0.00 |
2018-2019 ATV Bridge/Trail Rehabilitation Requests
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NER |
Oconto
NO. 11 |
The county proposes to apply dust control on the Nicolet State Trail on sections along Highway 32. The dust is causing visibility issues on the highway and the Town of Townsend has requested a solution. The county has had success with this project in the past. Requesting $65,000 from RTP |
*Structure |
|
$130,000 |
|
4. Time frame: – How does it work? – How long will a treatment work? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$65,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$111,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 65,000.00 |
Labor |
$18,300 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$65,000 |
|||
WCR |
Jackson
NO. 12 |
Sugar Loaf Rehab – Jackson County proposes to rehabilitate approximately 1/2 mile of ATV trail on Trail #9 (Pray Access Trail). Due to heavy use and unstable soil type this section of trail is very difficult to maintain. The county proposes to re-crown and surface this section of trail using 6 inches of 1 1/4 base course. |
*Structure |
|
$22,020 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$22,020 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$11,025 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$1,080 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$9,915 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$22,020 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Burnett
NO. 1 |
Troute Rehab – Burnett County is requesting rehab funds to repair portions of TROUTE 41 west of Dogtown Creek. The project will include adding gravel and dozing. TROUTE rehab is eligible at 50% of the $3600 for $1800. Dogtown TROUTE rehab. |
*Structure |
$1,800 |
$1,800 |
|
|
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$1,800 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$1,800 |
|||
NOR |
Burnett
NO. 2 |
Burnett County is requesting rehab funds to repair the bridge on Trail 925 by replacing the decking which will increase the weight limit to 14000 lbs, Trail 925 Bridge rehab |
*Structure |
|
$16,000 |
|
None. |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$8,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$7,000 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 8,000.00 |
Labor |
$9,000 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
12×42 |
New Bridge Size |
12×42 |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Glendenning Cr |
Labor Source: |
steel |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
20 |
Design Weight Load: |
14,00 |
UTV Maint |
$0 |
$8,000 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Burnett
NO. 3 |
Burnett County is requesting rehab funds for Trails 6 and 7 in the Town of Webb Lake. The project involves grading and add 4-6 inches of gravel. RTP funds are also applied for. |
*Structure |
|
$79,900 |
|
|
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$39,950 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$79,900 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
Yes |
Amount: |
$ 39,950.00 |
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$39,950 |
|||
NOR |
Burnett
NO. 4 |
Burnett County is requesting trail rehab funding to repair hotspots on Trail 41. The repairs are along a 4 mile section of the trail and include adding gravel to problem areas. Trail 41 Rehab. |
*Structure |
|
$21,600 |
|
1. Why weren’t snowmobile funds applied for? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$21,600 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$21,600 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$21,600 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Burnett
NO. 5 |
Burnett County is requesting rehab funds for Trail 8. The project includes repairs to problem areas on the 5.5 stretch of the trail. Trail 8 Rehab. |
*Structure |
$36,000 |
$36,000 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$36,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$36,000 |
|||
NOR |
Douglas
NO. 6 |
Douglas County proposes to complete 3 segments of trail rehab on the Wild Rivers Trail. The project is to add 4 inches of gravel to the 3 problem areas.
RTP fund applied for. |
*Structure |
|
$53,575 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$26,788 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$53,575 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
Yes |
Amount: |
$ 26,787.50 |
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$26,788 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Rusk
NO. 7 |
Rusk County proposes to replace the Moose Ear Bridge. Moose Ear Bridge Replacement.
Snowmobile funds have been applied for. |
*Structure |
$35,000 |
$49,500 |
|
Bridge questions:
|
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
|
$24,750 |
||||||||
site prep |
$3,500 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$2,500 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 24,750.00 |
Labor |
$8,500 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
12×24 |
New Bridge Size |
12×36 |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Moose Ear Cr |
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
? |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$24,750 |
|||
NOR |
Sawyer
NO. 8 |
Sawyer County proposes to rehab Trail 8 for 1.65 miles from Highway ‘OO’ to Boedecker Rd. |
*Structure |
$16,500 |
$24,750 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$24,750 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$8,250 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$24,750 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR |
Sawyer
NO. 9 |
Sawyer County proposes to rehab the Tuscobia Trail for 13.25 miles from the Price County line to Sundling Rd. Tuscobia Trail Rehab. |
*Structure |
|
$170,010 |
|
1. Why was only ATV funding requested? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$170,010 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$170,010 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$170,010 |
|||
NER |
Oconto
NO. 10 |
The county proposes to fence and add additional signage to this 2 mile segment of trail where ATVers are leaving the trial causing erosion, damage to trees, and destruction of natural resources. |
*Structure |
$7,500 |
$12,000 |
|
None |
|||
Engineer |
$3,510 |
After Cost Share: |
||||||||
Gravel |
$990 |
$12,000 |
||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
public |
Funded seasons: |
summer |
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$12,000 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NER |
Oconto
NO. 11 |
The county proposes to apply dust control on the Nicolet State Trail on sections along Highway 32. The dust is causing visibility issues on the highway and the Town of Townsend has requested a solution. The county has had success with this project in the past. Requesting $65,000 from RTP |
*Structure |
|
$130,000 |
|
4. Time frame: – How does it work? – How long will a treatment work? |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$65,000 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$111,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 65,000.00 |
Labor |
$18,300 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$65,000 |
|||
WCR |
Jackson
NO. 12 |
Sugar Loaf Rehab – Jackson County proposes to rehabilitate approximately 1/2 mile of ATV trail on Trail #9 (Pray Access Trail). Due to heavy use and unstable soil type this section of trail is very difficult to maintain. The county proposes to re-crown and surface this section of trail using 6 inches of 1 1/4 base course. |
*Structure |
|
$22,020 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$22,020 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$11,025 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$1,080 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$9,915 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$22,020 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Jackson
NO. 13 |
Indian Grave/Levis Creek Rehabilitation – This section of trail is part of Trail #9 (aka Ott Memorial Trail). Jackson County proposes to rehabilitate by re-crowning the trail in its existing footprint, surface the sections of trail to minimize or eliminate sediment loading, install silt fencing along the bridge during construction and seed the side of slopes of the trail to hold material in place. Due to the steep slopes, the thickness of gravel used will increase to 10 inches in depth. The total length of trail to be surfaced in 3,300 feet. |
*Structure |
|
$47,490 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$47,490 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$27,545 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$2,295 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$17,650 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$47,490 |
|||
WCR |
Jackson
NO. 14 |
Cranberry/Saddle Mound Rehabilitation – This section of trail is 2.8 miles of Trail 54. Jackson County proposes to rehabilitate by surfacing approximately 2,700 feet to protect the crown. The remainder of the trail will be crowned and/or ditched to alleviate problems with stormwater runoff. Thse sections will not be surfaced as part of this project. |
*Structure |
|
$31,775 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$31,775 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$13,650 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$3,240 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$14,885 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$31,775 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Jackson
NO. 15 |
Brockway Rehabilitation – This section of trail is part of Trail #9 (aka Ott Memorial Trail). Jackson County proposes to rehabilitate approximately 1.2 miles of trail using a combination of re-crowning the trail to facilitate drainage and surfacing two sections (totaling .6 miles) of this 1.2 miles that cause continual maintenance problems. |
*Structure |
|
$31,681 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$31,681 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$16,681 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
$2,160 |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
$12,840 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$31,681 |
|||
WCR |
Marathon
NO. 16 |
Marathon County proposes building a clear span bridge over the East Branch of the Big Eau Pleine River. The total length of the bridge with an approach on each end would be 85′. This is currently an unreliable ice crossing. This would be a NEW bridge. Snowmobile is being asked to fund this project at 50 percent. |
*Structure |
$63,000 |
$84,500 |
|
Bridge questions:
|
|||
Engineer |
$4,000 |
After Cost Share: |
||||||||
Gravel |
|
$42,250 |
||||||||
Permits/Erosion |
|
|||||||||
Materials |
$1,000 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$1,500 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 42,250.00 |
Labor |
$13,000 |
|
||||
Public or Private: |
private |
Funded seasons: |
winter |
Equip Rental |
$2,000 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
0 |
New Bridge Size |
12′ x 85′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Big Eau Pleine |
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
0 |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$42,250 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Marathon
NO. 17 |
Marathon County proposes to replace a structurally failing bridge on Baldwin Creek. Bridge #9 on BI. The total length of the bridge with an approach on each end would be 66′. Snowmobile is being asked to fund this project at 50 percent. |
*Structure |
$49,000 |
$70,000 |
|
Bridge questions:
|
|||
Engineer |
$4,000 |
After Cost Share: |
||||||||
Gravel |
$2,000 |
$35,000 |
||||||||
Permits/Erosion |
|
|||||||||
Materials |
$1,000 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$1,000 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 35,000.00 |
Labor |
$11,000 |
|
||||
Public or Private: |
private |
Funded seasons: |
winter |
Equip Rental |
$2,000 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
12′ 24′ |
New Bridge Size |
12′ x 66′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Baldwin Creek |
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
33 |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$35,000 |
|||
NOR-R |
Lincoln
No. 18 |
Lincoln County proposes replacing an existing club built bridge over Green Meadow Creek with a steel clear span bridge. The existing bridge is set too low and has been washed off the sill timbers more than once. The new bridge will be longer, allowing for it to be placed higher over the ordinary high water mark. Cost difference between 14k and 25k bridge is quoted at $2,500, County is requesting a 25k bridge. Bridge is used by snowmobiles and winter ATVs, county has applied for RTP (50%) and snowmobile (25%) as well. |
*Structure |
$45,000 |
$85,277 |
|
Bridge questions:
|
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$303 |
$21,319 |
||||||||
Permits/Erosio |
$3,500 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
$10,000 |
|
||||||||
Piling/Piers |
$10,000 |
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 63,958 |
Labor |
$15,344 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Winter |
Equip Rental |
$1,130 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
10′ x 30′ |
New Bridge Size |
12′ x 40′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Green Meadow |
Labor Source: |
Contract |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
unknown |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$21,319 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Lincoln
No. 19 |
Lincoln County proposes to replace a washed-out culvert with a pair of 42″x24′ culverts (technically a bridge rehab project), and install a pair of 36″x24′ culverts at another location a half-mile away on Four Mile Trail, Corridor 19. Trail is used by snowmobiles and winter ATVs, 50/50 split is requested. |
*Structure |
|
$10,003 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$303 |
$5,002 |
||||||||
Permits/Erosio |
$200 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$3,100 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 5,002 |
Labor |
$1,500 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Winter |
Equip |
$4,900 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
54″x36″18′ |
New Bridge Size: |
2 42″x24′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
unnamed |
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
unknown |
Design Weight Load: |
N/A |
UTV Maint |
$0 |
$5,002 |
|||
NOR-R |
Florence
No. 20 |
Florence County proposes to replace an undersized culvert on the F2 trail near County Hwy N. This year-round trail is open for ATV and Snowmobile use. The county is requesting a 50/25/25 split between RTP/ATV/Snow programs. |
*Structure |
|
$9,642 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$2,411 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$1,600 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$3,800 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$400 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 7,231 |
Labor |
$1,813 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip Rental |
$2,029 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
24″ Culvert |
New Bridge Size: |
64″x43″x50′ Culvert |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
run-off |
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
14+ |
Design Weight Load: |
N/A |
UTV Maint |
$0 |
$2,411 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Florence
No. 21 |
Florence County proposes to reshape and resurface 1.02 miles of trail and replace an undersized culvert on Trail 6 between the Oxbow Take Out and Johnson Creek Rd. The sandy soil in this area is prone to excessive erosions. The trail is also a snowmobile trail but the winter snowmobile use has not resulted in problems. The county is requesting 50% funding from the RTP program. |
*Structure |
|
$41,694 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$10,400 |
$20,847 |
||||||||
Erosion |
$1,000 |
|
||||||||
Materials |
$800 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$2,520 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$200 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 20,847 |
Labor |
$10,665 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip |
$16,109 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
49″x33″x40′ Culvert |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$20,847 |
|||
NOR-R |
Florence
No. 22 |
Florence County proposes to rehab 0.2 miles of Trail 6 south of the Pine River Bridge off of County Hwy N, to widen the trail and correct an erosion problem. Erosion problems have resulted in significant sediment deposit into the nearby Pine River. This trail is a year-round ATV trail as well as a snowmobile trail, and a fatality occurred in 2016 when a snowmobiler collided with a groomer in this narrow section. The county is requesting a 50/25/25 split between RTP/ATV/Snow programs. |
*Structure |
|
$18,992 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
|
$4,748 |
||||||||
Erosion |
$1,000 |
|
||||||||
Materials |
$1,250 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$2,000 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 14,244 |
Labor |
$6,684 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip Rental |
$8,058 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
N/A |
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$4,748 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Taylor
No. 23 |
Taylor County proposes to replace the decking and railings the Silver Creek bridge on the Pine Line trail. This trail is open for snowmobile and winter ATV as well as non-motorized use. The county is requesting a 50/25/25 split between RTP/ATV/Snow programs. |
*Structure |
|
$45,242 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$11,310 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$24,082 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
|
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 33,931 |
Labor |
$13,800 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Winter |
Equip Rental |
$4,600 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Disposal |
$2,760 |
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
10.8’x184′ |
New Bridge Size |
no change |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
Silver Creek |
Labor Source: |
Contract |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
28 |
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$11,310 |
|||
NOR-R |
Taylor
No. 24 |
Taylor County proposes to rehab 2.05 miles of trail 326 on USFS property, which includes replacing a failed culvert with a clear span bridge (McKenzie Creek South). The culvert has been damned by beavers and washed out regularly in the past. The USFS is contributing labor, equipment and materials for the project including equipment and labor for installation of the bridge. Some rehab work has already been done by the USFS on this segment to widen and level the trail. The county is requesting funds to continue the trail rehab work including 2″ stone and 3″ dense base surfacing. This trail rehab will make it possible to deliver the bridge and improve sustainability of the trail. County is also requesting a 50% cost share from RTP. |
*Structure |
$33,100 |
$76,902 |
|
` |
|||
Engineer |
$3,738 |
After Cost Share: |
||||||||
Gravel |
$18,800 |
$38,451 |
||||||||
Permits/Erosio |
$250 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
$10,000 |
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$170 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$1,800 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 38,451 |
Labor |
$400 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip |
$8,145 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Other |
$500 |
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
60″x25′ Culvert |
New Bridge Size |
32′ x 12′ |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
McKenzie Crk |
Labor Source: |
Contract + USFS |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
25,000 |
UTV Maint |
$0 |
$38,451 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Taylor
No. 25 |
Taylor County proposes to rehab 2.2 miles of trail on the Chequamegon National Forest (McKenzie Creek North). Of this 2.2 miles, 1.3 miles has become rutted, potholed and degraded due to poor design and heavy use. The county intends to level/shape with dozer/excavator, spot-treat with breaker run, and add a 4″ layer of gravel to the entire length. The remaining 0.9 miles will be leveld/shaped and spot- treated with gravel only where needed. Three 12″x20′ culverts will be installed for drainage. The county has also requested RTP funding. |
*Structure |
|
$30,361 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$21,140 |
$15,180 |
||||||||
Permits/Erosio |
$330 |
|
||||||||
Materials |
|
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$405 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 15,180 |
Labor |
|
|
||||
Public or Private: |
Public |
Funded seasons: |
|
Equip |
$8,486 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
20″x12′ culverts |
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Contract |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$15,180 |
|||
NOR-R |
Oneida
No. 26 |
Oneida County proposes to rehab 5 miles of trail in the Enterprise ATV Trail System (Phase 2). The rehab project begun with grant ATV-3362 and completed in 2017, which resurfaced southern 7 miles of the system. This project will complete the efforts be resurfacing the northern 5 miles of the system with 4 to 6″ depths of gravel. Resurfacing is necessary to address pot-holes, ruts and erosion, and protect the county’s forest certification by meeting the BMPs of the Sustainable Forestry Initiative and Forest Stewardship Council. County has also requested 50% from RTP. |
*Structure |
$92,400 |
$102,300 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel+Equip |
$51,150 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$9,900 |
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
Yes |
Amount: |
$ 51,150.00 |
Labor |
|
|||||
Public or Private: |
Public |
Funded seasons: |
S/S/F |
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$51,150 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR-R |
Iron
No. 27 |
Iron County proposes to rehab 8.1 miles of Trail 6 near near Saxon. Project will replace 30 plastic culverts that have heaved out of the ground with steel culverts, and put down a gravel base to protect the trail surface and address erosion concerns. The county is requesting 50% from RTP and is requesting a 75/25 split on the remaining costs between ATV/Snow. |
*Structure |
|
$148,736 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$55,776 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
$16,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$4,482 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 92,960 |
Labor |
$50,913 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Year-Round |
Equip Rental |
$76,641 |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|
||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force Account |
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$55,776 |
$932,650 $0
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
WCR |
Juneau
No. 30 |
Juneau County is requesting maintenance on 3.2 new miles for ATV/UTV trail on the Hillsboro State Trail. The trail is maintained by agreement of Juneau County, Vernon County and the City of Hillsboro. This request is in anticipation of the trail becoming approved for multi-use with the 2018 calendar year. The trail links the Village of Union Center in Juneau County to the City of Hillsboro in Vernon County. This would be the first State Trail Corridor open to ATV/UTV’s in the County. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
summer, winter |
Equip Rental |
|
|||||
New Sum Maint |
3.2 |
New Winter Maint |
3.2 |
Gates |
|
|||||
New UTV Maint |
3.2 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$1,920 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$320 |
$2,560 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$320 |
$2,560 |
|||
WCR |
Juneau
No. 31 |
Juneau County is requesting maintenance on 1 new mile of ATV/UTV trail. New trail will expand riding and bridge routes in an area that are divided by State Hwy. 58. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
summer, winter |
Equip Rental |
|
|||||
New Sum Maint |
1 |
New Winter Maint |
1 |
Gates |
|
|||||
New UTV Maint |
1 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$600 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$100 |
$800 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$100 |
$800 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Question/Answer |
|||
NOR- R |
Taylor
No. 32 |
Taylor County proposes to develop 2.02 miles of trail connecting the Camp 8 ATV Trail System to the Village of Spirit. This trail was previously open as an unfunded trail but heavy use necessesitated it’s closure. Scope of work includes leveling/shaping, spot-treatment with breaker-run, and a 4″ layer of gravel applied to the length of trail, as well as several culverts. This trail is already a funded winter ATV trail (and snowmobile), this project will turn it into a year-round funded trail. County has requested 50% from RTP. |
*Structure |
|
$43,073 |
|
– the village -the Camp 8 trail system |
|||
Engineer |
|
After Cost |
||||||||
Gravel |
$26,690 |
$21,537 |
||||||||
Erosion |
$120 |
|
||||||||
Materials |
$1,100 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$1,440 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$320 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 21,536 |
Labor |
$400 |
|
||||
Public or Private: |
|
Funded seasons: |
Year-Round |
Equip |
$12,253 |
|
||||
New Sum Maint |
2.02 |
New Winter Maint |
0 |
Gates |
$750 |
|
||||
New UTV Maint |
2.02 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$1,212 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Contract |
Winter Maint |
$0 |
$1,414 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$202 |
$22,951 |
$26,310.60 $0.00
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments |
|||
NOR |
Burnett
No. 40 |
Burnett County proposes to add 2.2 miles on new TROUTE in the Town of Blaine. This TROUTE runs from the intersection of Trail 925 and 151 to Big Mcgraw Rd route. |
|
|
$660 |
|
1. Explain how this qualifies as a troute. |
|||
$660 |
||||||||||
Current Non-Gas Tax Miles |
|
New Non-Gas Tax Miles |
2.2 |
|
||||||
Current Gas Tax Miles |
|
New Gas Tax Miles |
|
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ 660.00 |
|
|||||||
|
GT Rds |
$ – |
$660 |
|||||||
WCR |
Eau Claire
No. 41 |
Eau Claire County wishes proposes to maintain 3.28 miles of Troute on gas-tax funded forest roads. Channey Road 2.44 miles and Forest Road #3 .84 miles. The additional new miles of 3.28 of as tax funded forest road Troute @ $287.96 = $944.44 |
|
|
$944 |
|
|
|||
$944 |
||||||||||
Current Non-Gas Tax Miles |
|
New Non-Gas Tax Miles |
|
|
||||||
Current Gas Tax Miles |
|
New Gas Tax Miles |
3.28 |
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ – |
|
|||||||
|
GT Rds |
$ 944.50 |
$944 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments |
|||
NOR |
Oneida
No. 42 |
Oneida County proposes to maintain two segments of county forest road known as Bowman Rd (0.2 miles) and Zimmer Rd (2.2) miles. Bowman Rd connects trail-to- trail, while Zimmer Road connects trail to a parking lot as well as County Hwy (Route). |
|
|
$691 |
|
None |
|||
$691 |
||||||||||
Current Non-Gas Tax Miles |
|
New Non-Gas Tax Miles |
|
|
||||||
Current Gas Tax Miles |
1.9 |
New Gas Tax Miles |
2.4 |
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ – |
|
|||||||
|
GT Rds |
$ 691.10 |
$691 |
|||||||
NOR-R |
Langlade
(See No. 57) |
Langlade County proposes to maintain 6.28 miles of non-gas-tax Forest Service roads in conjuction with their development request for new ATV trails near the Town of Wolf River. See the new summer development application (Wolf River) for details. |
|
|
$1,884 |
|
None |
|||
$1,884 |
||||||||||
Current Non-Gas Tax Miles |
3.5 |
New Non-Gas Tax Miles |
6.28 |
|
||||||
Current Gas Tax Miles |
|
New Gas Tax Miles |
|
|
||||||
Variance or |
CSS Comments: |
|
||||||||
Exception? |
Non GT Rds |
$ 1,884.00 |
|
|||||||
|
GT Rds |
$ – |
$1,884 |
|||||||
|
|
|
|
|
|
|
|
$4,180 |
$0.00 |
|
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR |
USFS-Sawyer
No. 50 |
Deadhorse Amendment. The USFS request additional funding to complete the boardwalks from Grant ATV-2086. The project includes the construction of 2 bridges constructed to USFS specifications. This amendment is in addition to the $315,480 from the existing grant. Deadhorse Amendment. |
*Structure |
$279,044 |
$279,044 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$279,044 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
|
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$279,044 |
|||
NER |
Oconto
No. 51 |
The USFS is proposing to construct a new section of trail to include a new bridge over Knowles Creek. The project will add .43 miles of ATV/UTV trail and 1.70 miles of Troute. This project will provide a direct connection between the Nicolet State Trail and northern Marinette County trails. Bridge estimate = $197,000 and trail dev estimate = $91,475.
Applying for RTP grant. |
*Structure |
$116,000 |
$288,475 |
|
None |
|||
Engineer |
$7,000 |
After Cost Share: |
||||||||
Gravel/pit run |
$47,150 |
$144,238 |
||||||||
trail const |
$22,350 |
|
||||||||
gates & signs |
$3,225 |
|
||||||||
Abutments |
$20,000 |
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
site prep |
$15,000 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$2,000 |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 144,237.00 |
Labor |
$7,000 |
|
||||
Public or Private: |
|
Funded seasons: |
summer |
Equip Rental |
$18,750 |
|
||||
New Sum Maint |
0.43 |
New Winter Maint |
|
site engineerin |
$30,000 |
|
||||
New UTV Maint |
0.43 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
n/a |
New Bridge Size |
150′ x 12′ |
Sumer Maint |
$258 |
|
|||
Exception? |
Water Body: |
Knowles Creek |
Labor Source: |
contractor |
Winter Maint |
$0 |
$301 |
|||
|
Years in System: |
n/a |
Design Weight Load: |
20,000 |
UTV Maint |
$43 |
$144,539 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Woodboro, Town of
No. 52 |
The Town of Woodboro proposes to develop 1.7 miles of ATV/UTV trail in the DNR Woodboro Lakes Wildife Area. This trail will connect town route Oscar Jenny Rd to a proposes new ATV trail on Oneida County land (application below). A 50′ boardwalk is needed to cross a wetland on the wildlife area. The town is working with Oneida County in the hopes that the county will take over long term maintenance and management of the trail. The town has applied for grant assistance from the RTP program as well, and the Nokomis ATV Club is donating $30,000. |
*Structure |
$107,600 |
$385,900 |
|
|
|||
Engineer |
$60,000 |
After Cost Share: |
||||||||
Gravel |
$83,600 |
$177,950 |
||||||||
Erosion |
$14,000 |
|
||||||||
Materials |
$12,100 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$4,500 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$15,000 |
|
|||||||
Yes or No: |
YES |
Amount: |
$ 207,950 |
Labor |
|
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Clearing |
$60,500 |
|
||||
New Sum Maint |
1.7 |
New Winter Maint |
|
Misc |
$28,600 |
|
||||
New UTV Maint |
1.7 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$1,020 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Contract |
Winter Maint |
$0 |
$1,190 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$170 |
$179,140 |
|||
NOR-R |
Oneida
No. 53 |
Oneida County proposes to develop 1.2 miles of ATV/UTV trail connecting the proposed Woodboro Lakes Wildlife Area trail to the north (above) with Cruisers Road (route) to the south. The trail footprint will utilize existing logging roads but culverts will be installed to control drainage, spot-treatment with pit-run to raise the trail as needed, and a 4-6″ cap of loose gravel will be added, leveled, packed and crowned. No wetland crossings are needed. The county has applied for grant assistance from the RTP program as well. |
*Structure |
|
$50,566 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$12,600 |
$25,283 |
||||||||
Erosion |
$420 |
|
||||||||
Materials |
$2,700 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$375 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
YES |
Amount: |
$ 25,283 |
Labor |
$1,585 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Equip Rental |
$30,087 |
|
||||
New Sum Maint |
1.2 |
New Winter Maint |
|
Gates |
$2,800 |
|
||||
New UTV Maint |
1.2 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$720 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
Force |
Winter Maint |
$0 |
$840 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$120 |
$26,123 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Oneida
No. 54 |
Oneida County proposes to maintain 1.1 miles of ATV/UTV trail in the Little Rice area known as the Willow Dam Trail. This trail utilizes an old logging road and was opened for use on DNR land last year, with the local club provinding labor and materials. The county is seeking maintenance only to continue to provide this route-alternative for trail riders. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
Public |
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
1.1 |
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
1.1 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$660 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$770 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$110 |
$770 |
|||
NOR-R |
Vilas
No. 55 |
Vilas County proposes to maintain 1.6 miles of new ATV/UTV trail in Conover, along CTH K. This new trail was in place and open last year, and replaces a stretch of route on county highway. The county is seeking maintenance only to continue to provide this route-alternative for trail riders. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
Public |
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
1.6 |
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
1.6 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$960 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$1,120 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$160 |
$1,120 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Vilas
No. 56 |
Vilas County proposes to maintain 6.1 miles of new ATV/UTV trail in Land O’ Lakes connecting to the current Conover area trails. This new trail was in place and open last year. The county is seeking maintenance only. |
*Structure |
|
$0 |
|
None |
|||
Engineer |
After Cost Share: |
|||||||||
Gravel |
$0 |
|||||||||
Permits/Erosion |
|
|||||||||
Materials |
|
|
||||||||
Abutments |
|
|||||||||
Piling/Piers |
|
|||||||||
Approaches |
|
|||||||||
Culverts |
|
|||||||||
Other funds received, requested, or committed? |
Riprap |
|
||||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
|||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|||||
New Sum Maint |
6.1 |
New Winter Maint |
|
Gates |
|
|||||
New UTV Maint |
6.1 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$3,660 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$4,270 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$610 |
$4,270 |
|||
NOR-R |
Langlade
No. 57 |
Langlade County proposes to develop 3.3 miles of new trail (and maintain 6.28 miles of new troute) near the Town of Wolf River. This project includes development of a 120′ multi-use bridge over the Wolf River. In conjuction with local routes, this will create a connection between the Nicolet State Trail and the Wolf River State Trail. The county has already obtained a $19,900 grant from the Forest Service for work on the forest service troutes. The county is requesting grant funds from the Snowmobile and RTP programs for construction of the bridge. Cost share request below currently does not include RTP. |
*Structure |
$190,000 |
$419,921 |
|
None |
|||
Engineer |
$61,750 |
After Cost Share: |
||||||||
Gravel |
$36,419 |
$265,746 |
||||||||
Permits/Erosio |
$5,240 |
|
||||||||
Materials |
$35,435 |
|
||||||||
Abutments |
$15,000 |
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
$20,000 |
|
||||||||
Culverts |
$2,517 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
$5,000 |
|
|||||||
Yes or No: |
YES |
Amount: |
$ 154,175.00 |
Labor |
$10,000 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Clearing Trees |
$17,020 |
|
||||
New Sum Maint |
3.3 |
New Winter Maint |
|
Other |
$21,540 |
|
||||
New UTV Maint |
3.3 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
120′ x 12′ |
Sumer Maint |
$1,980 |
|
|||
Exception? |
Water Body: |
Wolf River |
Labor Source: |
|
Winter Maint |
$0 |
$2,310 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$330 |
$268,056 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
Comments/Answers |
|||
NOR-R |
Oneida
No. 58 |
Oneida County would like to eliminate a half-mile of road route (Bowman Rd, currently a funded “troute”) and replace it with 0.56 miles of new ATV/UTV trail. This segment connects to funded ATV trail on both ends, and would be part of the 12+ mile Enterprise ATV system. Scope of work includes clearing, dozing, gravel/fill, culverts and gates. The county has also applied to the RTP program for 50% cost share. |
*Structure |
|
$16,361 |
|
None |
|||
Engineer |
|
After Cost Share: |
||||||||
Gravel |
$4,466 |
$8,181 |
||||||||
Erosion |
$1,351 |
|
||||||||
Materials |
$5,416 |
|
||||||||
Abutments |
|
|
||||||||
Piling/Piers |
|
|
||||||||
Approaches |
|
|
||||||||
Culverts |
$810 |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|
|||||||
Yes or No: |
No |
Amount: |
$ 8,180 |
Labor |
$860 |
|
||||
Public or Private: |
Public |
Funded seasons: |
Summer |
Equip |
$658 |
|
||||
New Sum Maint |
0.56 |
New Winter Maint |
|
Gates |
$2,800 |
|
||||
New UTV Maint |
0.56 |
|
|
|
|
|||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$336 |
|
|||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$392 |
|||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$56 |
$8,573 |
$911,634.93 $0.00
2018-2019 ALL-TERRAIN VEHICLE NEW INTENSIVE USE AREA REQUESTS
$239,000.00 $0.00
Proj #
70
71
2018-19 ALL-TERRAIN VEHICLE NEW MAP REQUESTS
REGION |
COUNTY |
DESCRIPTION |
TOTAL |
APPROVED |
NOR |
Douglas |
10,000 ATV Maps |
$4,200 |
|
NOR-R |
Oneida |
Littlerice & Enterprise ATV Maps (3,500) |
$1,575 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$5,775 $0
Page 25 of 33
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Bayfield
No. 80 |
Bayfield County is requesting winter maintenance funding on Trail 18 in Delta Township. This is a short section of existing trail that is not funded. Snowmobile funding is also requested. Trail 18 new miles. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
3.44 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$344 |
$344 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$344 |
||
NOR |
Bayfield
No. 81 |
Bayfield County is requesting maintenance funding for Trail 17 connector. The trail will connect Gordon to the Hayward area involving Sawyer, Douglas, and Bayfield County. Trail 17 Connector. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
5.69 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$569 |
$569 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$569 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Burnett
No. 82 |
Burnett County is requesting maintenance funding on Trail 8A for 1.3 miles. Trail 8A new miles. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
1.3 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$130 |
$130 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$130 |
||
NOR |
Burnett
No. 83 |
Burnett County is requesting maintenance funding on Trail 8 for 2 miles. Trail 8 new miles. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
2 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$200 |
$200 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$200 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Douglas
No. 84 |
Douglas County is requesting maintenance funding on Trail 17 for 6.4 miles. The trail will connect Gordon to the Hayward area involving Sawyer, Douglas, and Bayfield County. Trail 17 Connector. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
6.4 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$640 |
$640 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$640 |
||
NOR-R |
Lincoln
No. 85 |
Lincoln County proposes to maintain 4.2 miles of winter ATV trail in the Harrison Hills area. These trails (two segments) has been open for winter ATV use for many years but was not receiving winter ATV funding. County is looking for mainteance only, no development funds needed. |
*Structure |
|
$0 |
Bridge questions:
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$0 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
Public |
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
4.2 |
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$420 |
$420 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$420 |
23.03 $2,303 $0
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Bayfield No. 90 |
Bayfield County is requesting funding to construct a shelter at the trailhead on Trail 3 and 43. Trail 3 Shelter. |
*Structure |
|
$21,992 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$21,992 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$17,112 |
|
|||||||
Abutments |
|
|
|||||||
Piling/Piers |
|
|
|||||||
Approaches |
|
|
|||||||
Culverts |
|
|
|||||||
Other funds received, requested, or committed? |
Riprap |
|
|
||||||
Yes or No: |
No |
Amount: |
|
Labor |
$4,380 |
|
|||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
|
|||
New Sum Maint |
|
New Winter Maint |
|
Other-permit |
$500 |
|
|||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$21,992 |
||
NOR |
Burnett No. 91 |
Burnett County requests additional funding for the Danbury Campground. The request is for 60% of the total cost of $1,100,100.
The county is also applying for RTP, Motorized Stewardship which they plan to match with 20% of county funds. |
*Structure |
|
$584,260 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$584,260 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$584,260 |
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$584,260 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Shell Lake No. 92 |
The City of Shell Lake is requesting an amendment to the the existing grants to finish the campground project. The increase is due to higher than expected bids for the project. Shell Lake ATV Campground
Also applying for Motorized Stew which would reduce this request. |
*Structure |
|
$285,006 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$285,006 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$285,006 |
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$285,006 |
||
NOR |
Rusk No. 93 |
Rusk County is requesting funding to construct an replace an old outhouse at the Blue Goose warming shelter. This is used by both ATV and Snowmobile. Total cost is $15,490 with $3750 being donated by the loacl clubs. Blue Goose Toilet replacement.
The remaining half is being requested from snowmobile. |
*Structure |
$15,490 |
$15,490 |
None |
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$5,870 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
TRUE |
Amount: |
$ 9,620.00 |
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$5,870 |
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
WCR |
Jackson No. 94 |
Emergency Response Improvements – Jackson County Forestry & Parks in conjunction with Black River Falls EMS, Jackson Co Sheriff’s Dept., BR Memorial Hospital, Gundersen Lutheran Air Medical Services and the BR Forest propose to further enhance the emergency services that can be provided on the trail system. The project will include increasing signage to provide markers on both sides of the trail and construction of four helipad locations. (See narrative for more details.) |
Const. & Sign |
$9,250 |
$9,250 |
None |
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$9,250 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
|
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
No |
Amount: |
|
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Gates |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$9,250 |
Total $906,378 $0
Page 31 of 33
Region |
County |
Description |
Component |
Costs |
Total |
Approved |
|||
NOR |
Burnett No. 170 |
Burnett County is proposing to acquire a 10 acre parcel of land to complete a trail between two of the County’s existing land. Trail 45 Acquisition.
Half has been requested from Snowmobile. |
*Structure |
|
$25,000 |
|
|||
Engineer |
After Cost Share: |
||||||||
Gravel |
$12,500 |
||||||||
Permits/Erosion |
|
||||||||
Materials |
$25,000 |
|
|||||||
Abutments |
|
||||||||
Piling/Piers |
|
||||||||
Approaches |
|
||||||||
Culverts |
|
||||||||
Other funds received, requested, or committed? |
Riprap |
|
|||||||
Yes or No: |
Yes |
Amount: |
$ 12,500.00 |
Labor |
|
||||
Public or Private: |
|
Funded seasons: |
|
Equip Rental |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Acquisition |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$12,500 |
||
WCR |
Adams/ Dyracuse
No. 171 |
Town of Rome ATV Intensive Use Area proposes to purchase 155.27 acres from Meteor Timber Holdings LLC. The property is contiguous to Dyracuse property purchased with grant funding in 2017. The cost includes the property, along with an appraisal, attorney’s fees, and other associated costs. |
Campsite |
|
$423,000 |
|
|||
Electrical |
After Cost Share: |
||||||||
Gravel |
$423,000 |
||||||||
Site Prep |
|
||||||||
Other labor |
|
||||||||
Signage/Maps |
|
|
|||||||
Challenge track |
|
||||||||
Topsoil |
$423,000 |
|
|||||||
Labor |
|
||||||||
Other funds received, requested, or committed? |
Picnic Tables |
|
|||||||
Yes or No: |
No |
Amount: |
|
Equip Rental |
|
||||
Public or Private: |
|
Funded seasons: |
|
Fire Rings |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Acquisition |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$423,000 |
WCR |
Adams/ Dyracuse
No. 172 |
Town of Rome ATV Intensive Use Area proposes to purchase 120.0 acres from Robert Kublank. Ths property is contiguous to Meteor Timber Holdings, LLC property that the Town is considering. The cost includes the property, along with an appraisal, attorney’s fees, and other associated costs. |
Campsite |
|
$328,000 |
|
|||
Electrical |
After Cost Share: |
||||||||
Gravel |
$328,000 |
||||||||
Site Prep |
|
||||||||
Other labor |
|
||||||||
Signage/Maps |
|
|
|||||||
Challenge track |
|
||||||||
Topsoil |
$328,000 |
|
|||||||
Labor |
|
||||||||
Other funds received, requested, or committed? |
Picnic Tables |
|
|||||||
Yes or No: |
No |
Amount: |
|
Equip Rental |
|
||||
Public or Private: |
|
Funded seasons: |
|
Fire Rings |
|
||||
New Sum Maint |
|
New Winter Maint |
|
Acquisition |
|
||||
New UTV Maint |
|
|
|
|
|
||||
Variance or |
Old Bridge Size: |
|
New Bridge Size |
|
Sumer Maint |
$0 |
|
||
Exception? |
Water Body: |
|
Labor Source: |
|
Winter Maint |
$0 |
$0 |
||
|
Years in System: |
|
Design Weight Load: |
|
UTV Maint |
$0 |
$328,000 |
||
|
|
|
|
|
|
|
|
$763,500.00 |