Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.

West Harbor Utilities Project – Bingen Point Business Park – Klickitat County Port District (TPD1808044)

Klickitat County Port District No. 1

154 E Bingen Point Way Ste. A Bingen, WA 98605

509-493-1655

Marc Thornsbury, Executive Director

Contract Documents

for project

2018-05

West Harbor Utilities Project

at

Bingen Point Business Park

 

Project ID:                     2018-05

Project Name:              West Harbor Utilities Project

Physical Location:          Bingen Point Business Park

Description:                  Provide all labor, materials, tools, and equipment and perform all work and related activities for the: installation of approximately 1,500 lineal feet of joint utility trench including: trenching, conduits, structures, backfill, and surface restoration; grading and embankment of approximately 3,900 cy of unclassified soil; grading, base aggregate and approximately 600 sf asphalt pavement; and all appurtenant work to complete the West Harbor Utilities Project in the Bingen Point Business Park, Bingen, Washington.

Bid

Publication Date(s):     August 1, 2018

Printing Fee:                 Fifty Dollars ($50.00)

Available:                      August 1, 2018 at 12:00 PM PPT

Closing:                         Aug 21, 2018 at 1:00 PM PPT

Opening:                       Aug 21, 2018 at 1:05 PM PPT

Pre-Bid Conference

Type:                              Non-mandatory

Location:                       Port administrative office at 154 E Bingen Point Way Ste. A; Bingen, WA 98605

Date:                          Aug 9, 2018 at 10:00 AM PPT

Contract Period:           Nov 2, 2018

Part 2 – PRODUCTS

2.1     Dust Control

A. The Contractor may use one or more of the following to control dust during performance of the Work:

  1. Water
  2. A soil stabilizer or dust palliative such as Eco-Tac, Soiltac, or Soilfloc.