Reference Library

Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.

Dust Control (TPD0507035)

Summary

The U.S. Army Engineer Research and Development Center (ERDC) Dust Control Program, developed in coordination with the U.S. Marine Corps Systems Command, evaluated commercial dust palliatives and application equipment for use in combat and sustainment environments. Field demonstrations conducted on helipads and unpaved roads—such as those in Yuma, Arizona—validated the use of polymer-based products like Soiltac®, a synthetic copolymer emulsion from Soilworks, for mitigating dust under rotor wash and along lines-of-communication. These tests informed rapid procurement and deployment strategies, with materials shipped to Iraq and Afghanistan within 45 days of ERDC recommendations. Modified hydroseeding equipment was used for large-area applications on helipads and taxiway edges.

For military engineers, aviation safety planners, and defense contractors, Soilworks delivers:

Soiltac®: Field-tested dust suppressant for helipads, base perimeters, and unpaved roads under tactical conditions

Compatible with hydroseeders and mission-specific application systems

Proven performance in improving visibility, reducing brownout, and enhancing mobility in theater

To increase surface safety and reduce maintenance in forward-operating environments, contact Soilworks for defense-grade Soiltac deployment support and ERDC-aligned application guidance.

US Army Corps Of Engineers

Engineer Research and Development Center

 

Investigations of dust control by the ERDC Geotechnical and Structures Laboratory focus on developing product recommendations and application guidance for mitigating dust on helipads and lines-of-communication in both combat and sustainment roles. The program began in FY04 in support of Operations Enduring Freedom and Iraqi Freedom for the U.S. Marine Corps Systems Command (MCSC).

Capabilities

Efforts to identify optimal solutions for dust mitigation have involved a thorough evaluation of commercial-off-the-shelf dust palliatives as well as application equipment. Field demonstrations have validated procedures for effectively reducing dust on helipads and unpaved roads. In early FY06, a dust abatement handbook will be published as an ERDC report. The handbook will offer complete guidance including considerations such as climate, soil type, mission objectives, and resource availability.

Benefits

Effective dust control measures can reduce the threat of dust-related casualties during military operations and improve mobility in theater. Prevention of brown-out conditions during helicopter landings can decrease vehicle maintenance and reduce the threat of crew fatalities. Enhanced visibility along lines-of-communication and in base camps can improve support maneuvers and operational efficiency.

Success Stories

ERDC team members conducted an initial field demonstration of helipad dust abatement in Yuma, AZ. Based on their recommendations, the required materials were procured by MCSC and available for use in Iraq and Afghanistan 45 days after the demonstration.

Hydroseeding application devices modified to meet Marine Corps specifications were used to treat helipads and large areas adjacent to taxiways on U.S.-controlled airfields. Dust palliatives recommended by ERDC researchers provided relief from the persistent dust problems associated with helicopter and aircraft movement.

 

Points of Contact      Jeb S. Tingle, Geotechnical and Structures Laboratory, Vicksburg, MS 39180-6199 Jeb.S.Tingle@erdc.usace.army.mil, 601-634-2467

John F. Rushing, Geotechnical and Structures Laboratory, Vicksburg, MS 39180-6199 John.F.Rushing@erdc.usace.army.mil, 601-634-3577

Dust mitigation on a U.S. Border Patrol road in Douglas, AZ, using a trailer-mounted hydroseeder being pulled by a HMMWV

ERDC researchers use a hydroseeder to create a dust-free helicopter landing pad in Yuma, AZ

 

U.S. Army Engineer Research and Development Center July 2005 www.erdc.usace.army.mil

Complete the form below to download this document now.

News & Updates Subscribe