Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.
Developed as a field-use decision tool for military installations, the U.S. Army Environmental Center’s guide offers a structured selection matrix for dust palliatives based on traffic volume, soil type, climate, and operational priorities. Among the top-tier recommendations, polymer-based suppressants—which align with Soiltac, Soilworks’ synthetic copolymer emulsion—are repeatedly cited as primary solutions across varied conditions, especially for wheeled vehicle traffic on sandy, clay, or loamy soils. The guide emphasizes polymers for their performance in arid to humid climates, ability to withstand frequent vehicular passes, and environmental compatibility. It further notes that polymers offer better cost-efficiency over repeated applications compared to traditional salts, oils, and electrochemical stabilizers, particularly on surfaces where paving is not feasible.
For military engineers, base facility managers, and environmental compliance officers, Soiltac delivers a high-performance, field-tested alternative that meets the guide’s criteria for durability, dust control, and reduced environmental risk. When non-water-dependent solutions are needed—such as during dry-season operations or remote staging—Durasoil provides long-lasting PM control without evaporation or runoff. Soilworks supports agencies with climate- and soil-specific application plans, deployment logistics, and ongoing performance monitoring strategies. Contact Soilworks to implement products already aligned with DoD’s recommended dust control protocols.
43. Recommended product category for the trafficked surface:
Primary: Polymers Go to 44
see references 17, 20
Secondary: Petrol Go to 44
see reference 20
US ARMY CORPS OF ENGINEERS®
1-800-USA-3845
Printed on Recycled Paper
This key is designed to help military installations evaluate solutions for dust control problems. It recommends categories of chemical dust palliatives according to traffic volume, climatic factors, and soil types and textures.
The recommended palliatives recorded the best results in both empirical studies and literature surveys, though products may be about 50% to 75% less effective in areas where tracked- vehicle traffic predominates.
Work through the questions in this key to find the most effective chemical dust palliative for your installation. For best results, you’ll need the following data:
Once you determine the best chemical palliatives for conditions on your installation, consult the product manufacturers for application rates and concentrations. For more information on cost-effective dust control, check these publications:
Dust Control Selection Key
Go to 20
Go to 43
see references 10, 20, 31, 35
Primary: Organic, Non-Bituminous
Go to 43
see references 20, 37
Secondary: Salts or Electro-Chemical Stabilizers
Go to 43
see references 31, 35
Primary: Salts Go to 43
see references 31, 37
Secondary: Organic, Non-Bituminous
Go to 43
see references 20, 37
Primary: Petrol Go to 44 see references 10, 35
Primary: Organic, Non-Bituminous
Go to 44
see references 3, 11, 12, 13, 33 Secondary: Salts Go to 44 see references 18, 21
Primary: Organic, Non-Bituminous
Go to 44
see references 3, 11, 12, 13, 16, 20, 23, 24, 33, 36
Secondary: Salts Go to 44
see references 3, 11, 12, 13, 16, 21, 24, 2 , 36
Primary: Organic, Non-Bituminous
Go to 44
see references 11, 12, 13, 20, 23, 24
Secondary: Electro-Chemical Stabilizers
Go to 44
see reference 7
Primary: Salts Go to 44 see references 8, 15, 18, 21 Secondary: Organic, Non-Bituminous
Go to 44
see references 15, 23
Primary: Petrol Go to 44
see references 20, 2
Secondary: Organic, Non-Bituminous
Go to 44
see references 14, 18
Go to 22
121-361 of precipitation per year
Go to 23
Secondary: Organic, Non-Bituminous
Go to 44
see reference 20
Primary: Salts Go to 44
see references 16, 31
Secondary: Electro-Chemical Stabilizers
Go to 30
see reference 2
Go to 44
$10 per square yard, but can be significantly higher if
predominantly tracked-vehicle traffic is expected because thicker pavement is required for satisfactory performance.
Go to 28
Go to 29
Go to 43
see references 1, 20, 37
Secondary: Salts or Petrol Go to 43
see references 1, 4, 20, 31, 37
see references 1, 2, 10, 25, 27, 28, 32, 36
Secondary: Organic, Non-Bituminous
Go to 44
see references 1, 2, 6, 10, 20, 25, 32, 36
Go to 44
see references 6, 20, 30
Secondary: Petrol Go to 44
see reference 20
Primary: Salts Go to 44
see references 18, 28
Secondary: Organic, Non-Bituminous
Go to 44
see references 18, 30
Primary: Salts Go to 44 see references 4, 14, 20, 2 Secondary: Organic, Non-Bituminous
Go to 44
see references 14, 20
Primary: Salts Go to 44 see references 4, 16, 17, 18 Secondary: Organic, Non-Bituminous
Go to 44
see references 16, 17, 18