Soilworks products are the industry’s top standard due to our insistence on creating high performance soil stabilization and dust control products that stand up to rigorous testing – both in the lab and in the field. Our commitment to quality and performance has led to our involvement and testing in hundreds of real-world situations. The following library of reports, presentations, specifications, approvals and other similar documents provide you, our customer, the transparency and dependable assurance that is expected from Soilworks.
Project: Yodaville Training Complex
Subcontract No. S.302026.0.DTS.22, TO 002
Location: MCAS YUMA, AZ
Prepared by: G.Hart
Thursday, 9/22/22
SUBCONTRACTOR DAILY REPORT
Weather: Sunny Temperatures: Low 82°F High 101°F Winds: W 5-12 mph
PRESENT ON SITE:
Personnel | Title | Employer | Hours | ||
George Hart | Project Manager | DTS | 10 | ||
Jessica Dial | UXO Tech II/Admin | DTS | 10 | ||
Anthony Dial | UXO Tech III | DTS | 10 | ||
Raul Martinez | UXO Tech III | DTS | 10 | ||
Damian Bourdukofsky | UXO Tech II | DTS | 10 | ||
Travis Hollowell | UXO Tech II | DTS | 10 | ||
Robert Brooks | Heavy Equipment Operator | DTS | 10 | ||
Daniel Guerrero | UXO Tech I | DTS | 10 | ||
JOB SAFETY |
WAS A JOB SAFETY MEETING HELD THIS DATE? (If YES attach
copy of the meeting minutes) |
YES | NO | Total Work Hours on Job Site this Date | 80 |
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE? (If
YES attach copy of completed OSHA report) |
YES |
NO |
Cumulative Total of Work Hours From Previous Report |
690 |
|
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT? (If YES attach description of incident and proposed action.) |
YES |
NO |
Total Work Hours from Start of Project |
770 |
EQUIPMENT ON SITE:
Equipment | Quantity | Equipment | Quantity |
Pickup Truck 4wd | 4 | Bobcat 870 | 1 |
Support Trailer | 1 | Peterbilt Trucks | 2 |
5 ton Dump Truck | 1 | Flatbed/Low Boy Trailers | 2 |
1 Polaris Rangers | 1 | CAT 938 Loader | 1 |
1 Cutting Trailers | 1 | Cutting Gases Oxygen | 1 |
CASE Loader at Aux2 | 1 | Cutting Gases Propane | 1 |
DAILY PRODUCTION:
Activity | Total to Complete | Daily Complete | Total Complete | Percent Complete |
CCTs Replaced | 46 | 1 | 43 | 93% |
Vehicle Targets Removed | 13 | 13 | 13 | 100% |
Soil Tackifier Applied Soccer Field (Green) | N/A | 100% | 100% | 100% |
Soil Tackifier Applied MLT (Black) | N/A | 15% | 15% | 15% |
MLT Track Repaired | N/A | 100% | 100% | 100% |
CCT Transported to AUX II | 46 | 7 | 46 | 100% |
Process and Recycle CCT’s | 46 | 0 | 0 | 0% |
General Notes/Comments
Shipping Summary:
Unexploded Ordnance Found:
Site Visitors:
Loading Soiltac® into Truck
2nd Coat on Soccer Field
Grading MLT Track
Applying Soiltac to Interior Yodaville Roads
Copyright Soilworks, LLC 2003-. All Rights Reserved. Soilworks®, Soiltac®,
Gorilla-Snot®, and Durasoil® are registered trademarks of Soilworks, LLC.
Copyright Soilworks, LLC 2003-. All Rights Reserved. Soilworks®, Soiltac®,
Gorilla-Snot®, and Durasoil® are registered trademarks of Soilworks, LLC.